Phase 3

In phase 3, dynamic tests were carried out on the entire structure of the first floor and the post-tensioned timber frame of the second floor (July 2014).

Dynamic vibration and impact tests were carried out (impact hammer and sledge hammer). The load-bearing behaviour of the structure was recorded by 40 acceleration sensors. 