Phase 4
In the fourth phase, dynamic tests were carried out on the entire load-bearing structure (2-storey prestressed timber frame, composite slab with beech laminated veneer lumber on the first floor and hollow core slab on the second floor). The test phase took place in October 2014.
As for the other testing phases, dynamic vibration tests and impact tests were carried out (impact hammer and sledge hammer). The load-bearing behaviour of the structure was measured with 40 acceleration sensors.